Rehabilitation of the Existing Pezë e Vogël to Pezë e Madhe Road
The reconstruction of the existing road consists of improving road safety and asphalt layers, including the construction of a new water supply from the intersection of the national road to Peze e Madhe. The works consisted of widening the existing road to a paved road platform 5.5 m and 2×0.50 m wide (sidewalks).
The length of the road is 5.4 km. A bridge with a span of 25 m has been completed, as well as concrete works.
Works Completed:
- Demolition, Cleaning, and Earthworks
- Road Asphalt Layers
- Drainage pipe, box culvert, and drainage channels
- Sidewalks, curbstones
- Concrete Structure
- Bridge
- Bioengineering works
- Rehabilitation of the existing water supply