Rehabilitation of the Existing Pezë e Vogël to Pezë e Madhe Road

The reconstruction of the existing road consists of improving road safety and asphalt layers, including the construction of a new water supply from the intersection of the national road to Peze e Madhe. The works consisted of widening the existing road to a paved road platform 5.5 m and 2×0.50 m wide (sidewalks).

The length of the road is 5.4 km. A bridge with a span of 25 m has been completed, as well as concrete works.

Works Completed:

  • Demolition, Cleaning, and Earthworks
  • Road Asphalt Layers
  • Drainage pipe, box culvert, and drainage channels
  • Sidewalks, curbstones
  • Concrete Structure
  • Bridge
  • Bioengineering works
  • Rehabilitation of the existing water supply

Rehabilitation of the Existing Pezë e Vogël to Pezë e Madhe Road
Contracting AuthorityAlbanian Development FundContract Date28/12/2012Share